Five Lanterns, from Ewossa to Rwanda.
Lantern 1 is under construction in Ewossa, Edo State. Lanterns 2 to 5 are planned for Nigeria, Ghana, Kenya and Rwanda, and each one is built only once it is fully funded.
Turn each postcard over for the facts.
The picture side shows part of the design every Lantern shares. The written side says where it goes, where it stands, what it costs and when it is planned to light.

Lantern 1 · EwossaDesign visualization of Lantern 1 on open ground, not a photograph of the site Lantern 1, Ewossa.
On the founder’s family land.
- Status
- Under construction.
- Gifts
- Welcome, to help finish it. No target is shown.
Nigeria of 1,0001Lantern 1Ewossa, Edo State, NigeriaThe founder’s village
Lantern 2 · NigeriaDesign visualization of the Lantern from the rear: the design every Lantern shares Lantern 2, Nigeria.
The first Lantern to follow Ewossa.
- Status
- Planned. Open for support.
- Estimated target
- $180,000
- Raised so far
- Being confirmed
- Planned lighting
- Q2 2027, if fully funded
The target covers Both containers, fit-out, site works, power, compute, connectivity, water and toilets, transport, land registration, first-in-country legal setup, three years of running costs and 15% overhead.
Meet Lantern 2Nigeria est.$180kLantern 2NigeriaVillage to be confirmed
Lantern 3 · GhanaDesign visualization of the classroom container: the design every Lantern shares Lantern 3, Ghana.
The first Lantern in Ghana.
- Status
- Planned. Open for support.
- Estimated target
- $215,000
- Raised so far
- Being confirmed
- Planned lighting
- Q3 2027, if fully funded
The target covers Both containers, fit-out, site works, power, compute, connectivity, water and toilets, transport, land registration, first-in-country legal setup, three years of running costs and 15% overhead.
Meet Lantern 3Ghana est.$215kLantern 3GhanaVillage to be confirmed
Lantern 4 · KenyaDesign visualization of the facilitator’s home: the design every Lantern shares Lantern 4, Kenya.
The first Lantern in Kenya.
- Status
- Planned. Open for support.
- Estimated target
- $240,000
- Raised so far
- Being confirmed
- Planned lighting
- Q3 2027, if fully funded
The target covers Both containers, fit-out, site works, power, compute, connectivity, water and toilets, transport, land registration, first-in-country legal setup, three years of running costs and 15% overhead.
Meet Lantern 4Kenya est.$240kLantern 4KenyaVillage to be confirmed
Lantern 5 · RwandaDesign visualization of the classroom inside: the design every Lantern shares Lantern 5, Rwanda.
The first Lantern in Rwanda.
- Status
- Planned. Open for support.
- Estimated target
- $225,000
- Raised so far
- Being confirmed
- Planned lighting
- Q4 2027, if fully funded
The target covers Both containers, fit-out, site works, power, compute, connectivity, water and toilets, transport, land registration, first-in-country legal setup, three years of running costs and 15% overhead.
Meet Lantern 5Rwanda est.$225kLantern 5RwandaVillage to be confirmedLantern 6
Not yet addressed.
The plan is 25 Lanterns by 2030.
See the planKnow a village that needs one?
Notice to sendersTargets are planning estimates in US dollars. Funds raised are being confirmed and will appear only once verified. A Lantern is built only once it is fully funded.
Each target pays for a whole, working Lantern.
An estimated target is the full cost of one Lantern, from the containers to its first three years of running. It is a planning estimate, not a quote. When its seats fill, a Lantern can grow into a campus.
- Both containers. The 40-foot classroom and the 20-foot home stacked above it.
- The fit-out. 24 learning stations, cooling, lighting, and the facilitator’s kitchenette and wet room.
- Site works and safety. Clearing and plinths, a fence and gate, outside lighting, lightning protection, fire safety, and a crane truck to stack the home.
- Power. Solar on both roofs and a first solar canopy, the inverter and the battery.
- Compute. Two small servers that run every station and the offline tutor.
- Connectivity. Satellite internet, shared as free, filtered public Wi-Fi.
- Water and toilets. Filtered, tested drinking water, handwashing taps and the children’s toilets, with an allowance for a borehole where there is no safe source.
- Transport. Getting the Lantern from the fabricator to the village.
- Land registration. Securing the ground it stands on.
- First-in-country legal setup. The local entity and registration a new country needs.
- Three years of running costs. The facilitator’s pay, the connection, upkeep, and reserves to replace the battery and other worn parts.
- 15% overhead. The current planning rate, still under review.
Declared value$180,000 to $240,000estimated per Lantern, by country
Targets are planning estimates in US dollars. Funds raised are being confirmed and will appear only once verified.
Lantern 1 of 1,000.
Twenty-five Lanterns by 2030 is the plan. A thousand by 2050 is the goal: in villages and developing regions across the globe, a million children learning by their own light.
We are building towards it one fully funded Lantern at a time.
Read our story- NowVL-01Under construction1
Lantern 1, Ewossa. Under construction on the founder’s family land.
- 2027VL-02 to 05Planned5
Lanterns 2 to 5, planned to light through 2027 if fully funded.
- 2030PlanThe plan25
Twenty-five Lanterns by 2030: the operating plan.
- 2050GoalThe goal1,000
A thousand by 2050, and a million children: the goal.
Know a village that needs a Lantern?
Lanterns 2 to 5 still need their villages, and the plan is 25 by 2030. Put a village forward and it becomes a candidate: not a promise, but the first of six careful steps.
Choose the next village.
Four villages are waiting for light. Choose one to help light, or talk to us about funding a whole Lantern and giving it its name.