of 1,0001The build of Lantern 1, in 8 steps: 2 done, 1 happening now, 5 ahead
- Done.
A place to begin
Ewossa chosen for Lantern 1, on the founder’s family land.
- Done.
The design
A 40-foot classroom with 24 stations, and a 20-foot home above it for the facilitator.
- Happening now.
Under construction
Being built by a fabricator in Lagos.
- Ahead.
Ready to open
Power, connection, cooling and safety checked before any child walks in.
- Ahead.
Power for the village
Choosing the public building for the shared cable, with the village. A clinic comes first if there is one.
- Ahead.
A facilitator moves in
A local adult, police-checked, living upstairs and keeping the doors open.
- Ahead.
First lessons
Maths, English and Coding, for children aged 10 to 15.
- Ahead.
Measure and publish
A reading and maths baseline, a second test at twelve months, and the results published, whatever they show.